Murphy's 2026 Master Plan, Explained

On March 10, 2026, the Murphy City Council adopted a new Master Plan, replacing the 2008 Comprehensive Plan. Its central premise is that Murphy is nearly built out, so the city's job has shifted from managing growth to managing reinvestment.

Published October 12, 20266 min readBy The Grisak Group

What a master plan does

A master plan, or comprehensive plan, is the city's long-range policy statement on physical development: what land uses go where, how streets and trails should work, how the main corridors should look, and what kinds of business and redevelopment the city wants. It does not rezone property by itself. Zoning changes still go through the Planning and Zoning Commission and City Council case by case, but the plan is the guide those bodies use.

Murphy's previous plan dated to 2008, when the city still had large areas of undeveloped land. The city adopted its first master plan in 1973.

The starting point: a built-out city

The 2026 plan begins with numbers that frame everything else:

  • Area: about 5.7 square miles inside city limits, and a planning area of 5.76 square miles including the extraterritorial jurisdiction (ETJ).
  • ETJ: only 36 acres, to the north and west. The plan notes that recent state laws have limited cities' control over ETJ land, so Murphy's planning focuses on what happens inside its own limits.
  • Population: about 21,172 as of January 2025, expected to stay relatively stable. The plan says the city gained approximately 14,559 residents from 2000 to 2010 (Census counts of 3,099 and 17,708 put the gain at 14,609) and only 3,305 in the following decade.
  • Housing: about 6,159 units, with only about 161 more projected over the next five years.
  • Land use: about 70 percent residential, 16 percent institutional, 8 percent commercial, and 3 percent vacant.

The plan states the shift directly: since 2008 Murphy has largely filled in, and the focus has moved from growth management to reinvestment and refinement.

Wildflowers on the Blackland Prairie
Photo: Billy Bob Bain, CC BY 2.0

FM 544: "The Corridor"

FM 544 is Murphy's commercial spine. The plan reports nearly 55,000 vehicles a day on the road and about 1.72 million square feet of retail and office space in the city, with occupancy near 98.5 percent. In 2025, Murphy added 16,458 square feet of new commercial space, 22 new businesses opened, and four major construction projects began: a Walmart fuel station, Murphy USA, Everbrook Academy, and H-E-B. More than 180,000 square feet of additional commercial space is planned.

Two points stand out:

  • H-E-B. The plan reports that the long-anticipated H-E-B at the southwest corner of FM 544 and McCreary Road has broken ground and describes it as filling a long-standing need for a full-service grocery store in the city. The store opened on July 22, 2026.
  • Limited control. FM 544 is a TxDOT road. The plan calls for working with TxDOT, Collin County, and neighboring cities on intersections, signal timing, and corridor design, since Murphy's roads have limited room for widening.

Sales tax matters to the city's budget, and the plan reports that in fiscal 2025 retail produced 52 percent of Murphy's sales tax revenue, dining 22 percent, and services 18 percent, with online sales at about 33.5 percent of collections.

Housing: infill and compatibility

The plan names four residential infill projects that are approved or under way: Crescent Hill (by Toll Brothers, described as nearing completion), The Enclave at Maxwell Creek, Oasis Springs, and Murphy Gardens. It reports 42 single-family residential permits issued in 2025.

Its housing guidance centers on compatibility. New development next to or within established neighborhoods should reflect their character, and transitions between commercial sites and homes should use buffering, scale changes, or open space. The plan also notes that 84 percent of Murphy's homes were built before 2009 and 63 percent between 2000 and 2009, so maintaining an aging housing stock is part of the long-term picture.

Trails and the Maxwell Creek bridge

Maxwell Creek runs north and south through the city, and FM 544 runs east and west. The plan treats their intersection as a key problem. Participants at the first community forum singled out the planned trail bridge at FM 544 and Maxwell Creek as a critical crossing that would improve pedestrian safety on the corridor. Turning that into construction has proved harder: bids opened on April 30, 2026 ran from $5.6 million to $6.5 million, all over budget, and in October 2026 the City Council postponed a rebid until it discusses the project again in 2027.

Recommendations include:

  • more east-west crossings of Maxwell Creek,
  • sidepaths along Maxwell Creek north of FM 544,
  • connections to adjacent trail systems, including west along a rail line easement,
  • working with Plano ISD and Wylie ISD on Safe Routes to School improvements, and
  • preparing an ADA Transition Plan for city facilities and programs.

The plan counts about 106 miles of streets and 159 miles of sidewalks in Murphy and notes that sidewalk continuity is generally better in newer subdivisions than in older areas.

The 11 Murphy Opportunity Districts

The most specific part of the plan is a set of 11 Murphy Opportunity Districts, or MODs: sites the city believes need a tailored vision because they are prominent, underused, or likely to change. Each has its own page in the plan with location, size, current zoning, and a vision.

MOD Location Approximate size Current zoning
1. Dublin Gateway 700 FM 544, northeast corner of FM 544 and Dublin Road 3 acres Neighborhood Services and Agriculture/Open Space
2. Heritage Gateway South of FM 544, between Heritage Parkway and the DART rail line 4 acres Planned Development Retail with mixed use
3. Brand Gateway North of FM 544, east of the railroad tracks 22 acres Light Commercial
4. Community Center South West side of Murphy Road, north of FM 544 and the railroad tracks 12 acres Town Center and Planned Development Town Center
5. City Hall South East side of Murphy Road, north of FM 544 and the railroad tracks 12 acres Public/Semi-Public and Single-Family Patio
6. Murphy Crossing South of FM 544, east of Murphy Road 12 acres Planned Development Retail
7. Murphy Marketplace East West side of North Maxwell Creek Road, about 250 feet north of FM 544 8 acres Planned Development Retail
8. Kinney Drive Tract Kinney Drive 16 acres Parks/Open Space
9. Maxwell Creek East South of FM 544 at South Maxwell Creek Road 6 acres Single Family 20
10. McCreary Gateway Northwest corner of FM 544 and McCreary Road 8 acres Retail and Planned Development Retail/Light Commercial
11. North Murphy Gateway Southeast corner of North Murphy Road and Betsy Lane 3 acres Single-Family Attached

A few examples of the visions:

  • Dublin Gateway is envisioned as an entry into Murphy, with landscaping, entry signage, and commercial buildings around shared green space at the corner, stepping down toward homes to the north.
  • Brand Gateway, now a mix of auto-oriented and commercial uses, is envisioned for coordinated multi-story commercial redevelopment, such as a hotel with conference and event space or a campus-style medical development.
  • Murphy Crossing, which today has about 44,000 square feet of commercial space in five buildings with 29 tenant spaces and large surface parking lots, is identified for reinvestment.
  • Kinney Drive Tract is envisioned as a trail-oriented site; if developed at all, the plan suggests low-intensity uses such as a small pocket neighborhood or a trailhead and nature destination.
  • North Murphy Gateway is envisioned for small-scale retail and office with residential-style architecture and pedestrian links to Maxwell Creek. The city has already acted on this one. At the same March 10, 2026 joint meeting where it adopted the plan, the City Council rezoned the 3.2-acre tract from single-family attached (townhomes) back to Neighborhood Services, which allows light commercial and retail use, after denying a 32-townhome site plan there in January. All four corners of North Murphy Road and Betsy Lane are now zoned commercial.

What the plan does not do

The Master Plan does not approve any specific project, change any property's zoning, or commit city funds. Projects inside a MOD still need zoning approval if they differ from current zoning, and capital projects such as the trail bridge depend on future budgets and partner agencies. The plan is best read as a statement of priorities that will shape those later decisions.

Where to read it

The full plan and the separate MODs document are posted on the City of Murphy's Murphy Master Plan page. The 2008 Comprehensive Plan remains available there for comparison.

Sources (8)

Last reviewed October 12, 2026. See something out of date? Email info@grisak.com.