Murphy is nearly built out, so new homes come from a handful of small infill communities on the city's last open parcels. Each was approved under its own planned development ordinance.

Updated October 20265 min read18 sources

Photo: Robert Nunnally, CC BY 2.0

The big picture

The 2026 Murphy Master Plan describes Murphy as largely built out, with only 3 percent of its land vacant. It reports 42 single-family residential permits issued in 2025 and projects about 161 additional housing units citywide over the next five years, a figure that includes any multifamily or mixed-use units. The city's limited extraterritorial jurisdiction (36 acres) means it cannot grow outward; new housing has to come from infill.

The city maintains an Active Development Projects page listing approved projects and their ordinances. The residential projects on that list, as of October 2026, are below.

Crescent Hill (Toll Brothers)

  • Location: southwest corner of South Maxwell Creek Road and FM 544
  • Size: 14.629 acres
  • Zoning: rezoned from Single Family 20 (SF-20) to a planned development overlay based on the SF-9 district (Ordinance 21-12-1242, adopted December 7, 2021)
  • Homes: up to 37 single-family homes, maximum density 2.6 units per acre
  • Lot standards: minimum 10,000 square feet, 75 feet wide (65 feet on cul-de-sacs), 120 feet deep; front setback 25 feet; maximum lot coverage 50 percent
  • Home standards: minimum 2,200 square feet; maximum height 35 feet; front-entry garages; 8:12 minimum roof pitch on the main structure
  • Builder: Toll Brothers
  • Schools: Plano ISD for all 39 parcels on the 2026 appraisal roll; confirm campus assignments with Plano ISD's SchoolFinder

The Master Plan described Crescent Hill as nearing completion in early 2026, and the Collin Central Appraisal District's 2026 roll lists all 37 home sites with homes recorded as built from 2024 to 2026 (median living area 3,573 square feet). On that roll, living areas range from about 2,690 to 3,990 square feet and lots from about 0.23 to 0.48 acre (median 0.24).

Wildflowers on the Blackland Prairie
Photo: Billy Bob Bain, CC BY 2.0

The Enclave at Maxwell Creek

  • Location: McCreary Road, west of the Retreat at Wylie apartments
  • Size: 20.816 acres
  • Zoning: planned development using the Single-Family Residential Patio Homes (SF-PH) district (the approved standards supersede Ordinance 22-03-1253)
  • Homes: up to 104 homes, accessed from a private access easement, with no minimum lot dimensions; the concept plan shows two groups of 65 and 39 units
  • Standards: minimum 1,600 square feet per home, at least 6.5 feet between units, individual fire sprinkler systems in each home, visitor parking at the amenity area
  • 2026 status: construction is under way. The 2026 appraisal roll lists 67 parcels in Enclave at Maxwell Creek Phase 1: 48 homes recorded with a 2026 year built and no certified value yet, and 19 vacant lots.

Southfork Estates

  • Location: northwest corner of North Murphy Road and Betsy Lane
  • Size: 9.577 acres
  • Zoning: rezoned from Agriculture (AG) to a planned development with SF-9 residential and Neighborhood Services (NS) components (Ordinance 23-07-1317)
  • Homes: up to 27 lots
  • Lot standards: minimum 9,000 square feet, 75 feet wide (65 feet on cul-de-sacs), 120 feet deep; maximum lot coverage 40 percent
  • Home standards: minimum 2,000 square feet
  • 2026 status: no lots were recorded under the Southfork Estates name on the 2026 appraisal roll.

Oasis Springs and Murphy Gardens

The city's active development list also includes:

  • Oasis Springs, on North Murphy Road east of Stratford Crossing (Ordinance 16-10-1023, Oasis Springs Manors)
  • Murphy Gardens, on McMillen Road east of Maxwell Creek (Ordinance 24-05-1356)

The Master Plan names both, along with Crescent Hill and The Enclave, as residential infill projects that are approved or under way. Oasis Springs Manors is now built out: the 2026 appraisal roll shows nine homes completed from 2021 to 2025, with a median of 5,237 square feet. No lots were recorded under the Murphy Gardens name on the 2026 roll. Approved plan documents for both are posted on the city's Active Development Projects page; check with the city's Planning and Zoning staff for Murphy Gardens' current stage.

A townhome site rezoned to commercial

In January 2026 the City Council denied a site plan for Pecan Meadows, 32 townhomes on 3.2 acres at the southeast corner of North Murphy Road and Betsy Lane, even though the Planning and Zoning Commission had approved it 7-0 in December 2025. On March 10, 2026, at the joint meeting where the Master Plan was adopted, the council and commission rezoned the tract from its 2021 townhome planned development back to Neighborhood Services, which allows light commercial and retail use. All four corners of that intersection are now zoned commercial.

Nearby, outside city limits: Restore the Grasslands

A separate project sits between Murphy and Parker in unincorporated Collin County. On June 22, 2026, the Collin County Commissioners Court voted 3-1 to conditionally approve a final plat for Restore the Grasslands, a 101-acre development with 624 single-family lots and a single entrance. Its infrastructure would be financed through a proposed municipal utility district, Collin County MUD No. 7, whose application was before the State Office of Administrative Hearings in fall 2026, with a judge due to receive the case on November 30. The state has permitted a wastewater plant for the project that could discharge up to 200,000 gallons of treated effluent a day into Maxwell Creek; a suit to block the plant was pending in state district court in June 2026. The City of Murphy opposes the MUD but withdrew as a party to the hearing in March 2026.

Commercial and mixed-use projects

  • Murphy Gateway: a 3.799-acre mixed-use planned development on the south side of FM 544, east of Heritage Parkway, that allows restaurants, retail, offices, and loft apartments on upper floors of one lot.
  • H-E-B: opened July 22, 2026, at the southwest corner of FM 544 and McCreary Road, about 21 months after its November 2024 groundbreaking. The Murphy Monitor reported that a state filing listed the store at 122,175 square feet, with a separate fuel station and car wash.
  • Murphy Opportunity Districts: the Master Plan identifies 11 sites, from about 3 to 22 acres, for future redevelopment or infill, including the Dublin Gateway, Heritage Gateway, Murphy Marketplace East, Maxwell Creek East, McCreary Gateway, and North Murphy Gateway sites.

Custom building and teardowns

Murphy has very few vacant residential lots. Custom building opportunities are generally limited to older large-lot parcels, rebuilds on existing lots, or remaining agricultural or SF-20 parcels that may require rezoning. The 2026 appraisal roll shows how this plays out: 18 of the city's 138 homes on lots of 1 acre or more were built in 2005 or later, most of them on small one- to four-lot additions, in Willow Wood Ranch Estates, or on unplatted tracts, and their median 2026 certified market value (appraisal) is about $1.07 million. Before buying land, check the city's zoning map and request a zoning verification letter from the city.

Permitting notes

  • Planning and Zoning: rezonings and planned developments go to the Planning and Zoning Commission for a recommendation and then to City Council. Public notices for pending cases are posted on the city's Public Notices page.
  • Building permits: required for new residential construction, additions, and remodels, plus many exterior items including fences, pools, patio covers, retaining walls, re-roofing, and solar panels. Permits are applied for online through the city's Building Inspections portal.
  • Codes and appeals: a Building and Fire Code Appeals Board hears code questions.
  • HOA review: most subdivisions also require architectural approval from the homeowners association before a permit application.
  • Fire sprinklers: some recent planned developments, including The Enclave at Maxwell Creek, require residential fire sprinkler systems in every home.
  • Questions: the city's Customer Service Center, 972-468-4100.
Sources (18)

Last reviewed October 2026. See something out of date? Email info@grisak.com.

Questions about Murphy?

The Grisak Group has helped buyers and sellers across Collin County for more than two decades. Call, email or stop by the office in Allen.